Process calculation of ATP
- Added: 05.11.2014
- Size: 338 KB
- Downloads: 0
Subscribe to receive an information about new materials:
Description
Exchange rate in word format without drawings.
Process calculation of the road transport area. In order to determine the conformity of project and normative indicators, their comparison and assessment of the discrepancy of results were carried out. The process calculation as a whole complies with the requirements of ONTP, since the deviation of the calculated indicators from their reference values does not exceed ± 15%, but for two indicators (the area of production, warehouse and administrative and household premises) there is a deviation of more than 15%.
Process calculation of the road transport area. In order to determine the conformity of project and normative indicators, their comparison and assessment of the discrepancy of results were carried out. The process calculation as a whole complies with the requirements of ONTP, since the deviation of the calculated indicators from their reference values does not exceed ± 15%, but for two indicators (the area of production, warehouse and administrative and household premises) there is a deviation of more than 15%.
Project's Content
|
|
|
|
The material is an archive with files that can be opened in programs:
- Microsoft Word
Similar materials
- 24.01.2023
Free downloading for today
Update after: 9 hours 30 minutes
Other materials
- 25.01.2023