Power unit with installation of boilers, chilling machines and KGU
- Added: 09.08.2014
- Size: 1 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Plan, specifications. The gas supply project of the TRK power complex was carried out on the basis of: - tasks for the design of - - toposystems of the terrain - and in accordance with the requirements of SNiP 42-01-2002 Gas distribution systems, PB 12-529-03 Safety rules for gas distribution and gas consumption systems, RD 03-613-03, RD 03-614-03, RD 03-615-03.
Project's Content
|
энергоблок.dwg
|
Additional information
Drawings content
энергоблок.dwg
Similar materials
- 01.07.2014
- 30.04.2023
- 24.01.2023
Free downloading for today
Update after: 7 hours 32 minutes