• RU
  • icon Waiting For Moderation: 6
Menu

Power unit with installation of boilers, chilling machines and KGU

  • Added: 09.08.2014
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Plan, specifications. The gas supply project of the TRK power complex was carried out on the basis of: - tasks for the design of - - toposystems of the terrain - and in accordance with the requirements of SNiP 42-01-2002 Gas distribution systems, PB 12-529-03 Safety rules for gas distribution and gas consumption systems, RD 03-613-03, RD 03-614-03, RD 03-615-03.

Project's Content

icon
icon энергоблок.dwg

Additional information

Drawings content

icon энергоблок.dwg

энергоблок.dwg

Free downloading for today

Update after: 7 hours 32 minutes
up Up