Pipe plant. Modernization of TPC-3
- Added: 19.01.2019
- Size: 12 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
This Work Execution Project describes the technology of modernization (replacement of process equipment) of the pipe rolling shop of the pipe plant. Removal/installation of equipment is performed by units using existing shop bridge cranes Q = 16t and auxiliary mounting crane of type Maeda LC785. Shipment and supply of equipment to the working area of shop bridge cranes is carried out using vehicles along existing shop driveways (or railway platform ).