• RU
  • icon Waiting For Moderation: 0
Menu

Part of floor construction in rooms with wet operation mode

  • Added: 09.03.2014
  • Size: 12 KB
  • Downloads: 0
Find out how to download this material

Description

Recommendations
1. Waterproofing when applying an additional layer is laid with a trigger on the wall for 150 mm.
2. When glued with a mastic, the alignment layer is coated with the same mastic.

Project's Content

icon
icon Деталь сооружения полов в помещениях с влажным.dwg

Additional information

Drawings content

icon Деталь сооружения полов в помещениях с влажным.dwg

Деталь сооружения полов в помещениях с влажным.dwg
up Up