Part of floor construction in rooms with wet operation mode
- Added: 09.03.2014
- Size: 12 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Recommendations
1. Waterproofing when applying an additional layer is laid with a trigger on the wall for 150 mm.
2. When glued with a mastic, the alignment layer is coated with the same mastic.
Project's Content
|
Деталь сооружения полов в помещениях с влажным.dwg
|
Additional information
Drawings content
Деталь сооружения полов в помещениях с влажным.dwg
Similar materials
- 04.11.2022
Free downloading for today
Update after: 9 hours 41 minutes