Modernization of the aggregate section with the introduction of a disassembly bench - assembly of gearboxes of leading bridges of trucks using the example of Scala TransAuto LLC
- Added: 01.04.2015
- Size: 304 KB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The diploma project introduced a stand for assembling and disassembling the reduction gears of the leading bridges of trucks with its introduction on the aggregate section of the STO "Rock TransAuto."
Project's Content
|
Диплом_оформление дораб.docx
|
Требования по оформлению текстовой части.docx
|
Similar materials
- 29.07.2014
- 25.01.2023
- 03.05.2023
Free downloading for today
Update after: 23 hours 22 minutes