Modernization of the aggregate section with the introduction of a disassembly bench - assembly of gearboxes of leading bridges of trucks using the example of Scala TransAuto LLC
- Added: 01.04.2015
- Size: 304 KB
- Downloads: 1
Subscribe to receive an information about new materials:
Description
The diploma project introduced a stand for assembling and disassembling the reduction gears of the leading bridges of trucks with its introduction on the aggregate section of the STO "Rock TransAuto."
Project's Content
|
|
|
|
|
|
The material is an archive with files that can be opened in programs:
- Microsoft Word
Similar materials
- 29.07.2014
- 25.01.2023
- 03.05.2023
Free downloading for today
Update after: 14 hours 14 minutes