• RU
  • icon Waiting For Moderation: 0
Menu

Metal Structures - Construction site

  • Added: 27.12.2023
  • Size: 3 MB
  • Downloads: 0
Find out how to download this material

Description

These data:

 

Construction site III;

 

Coating Type: Heated;

 

Construction Zone III

 

         The span of the building is 36 m.

 

        The level of the crane rail is 7.4 m.

 

         The lifting capacity of the crane is 50 tons.

 

         Mode of operation 5k

 

         Pole pitch 6 m.

 

Composition of the Term Paper

 

1. Horizontal Frame Arrangement

 

2. Horizontal Frame Design

 

3. Truss calculation.

 

3.1 Collection of goods to the farm

 

3.2 Determination of Forces in Truss Cores

 

3.3 Selection and verification of truss core cross-sections

 

3.4 Design of Welds for Braces and Supports to Truss Styles and Purlins

 

4. Priority Calculation

Project's Content

icon Мк Курс Прав.docx
icon МК2 КЖ.dwg

Free downloading for today

Update after: 4 hours 30 minutes
up Up