Mall Ventilation
- Added: 26.07.2021
- Size: 1 MB
- Downloads: 2
Description
Ventilation project of the shopping complex building. The estimated outside air temperature is accepted as -31 ° C for the cold period, + 21.1 ° C for the warm period. In the building, a general exchange plenum-exhaust mechanical ventilation is designed. Independent plenum and exhaust installations are provided for the following groups of rooms: - first-floor supermarket trading room (P1, B1), - trading rooms of the 2nd, 3rd and 4th floors (P2, B2, P3, B3, P4, B4), - auxiliary rooms of the supermarket (P-5, B-7, B-8). In addition, separate exhaust systems are provided for bathrooms, showers.
Project's Content
1234.dwg
|
Additional information
1234.dwg