• RU
  • icon Waiting For Moderation: 16
Menu

Mall Ventilation

  • Added: 26.07.2021
  • Size: 1 MB
  • Downloads: 2
Find out how to download this material

Description

Ventilation project of the shopping complex building. The estimated outside air temperature is accepted as -31 ° C for the cold period, + 21.1 ° C for the warm period. In the building, a general exchange plenum-exhaust mechanical ventilation is designed. Independent plenum and exhaust installations are provided for the following groups of rooms: - first-floor supermarket trading room (P1, B1), - trading rooms of the 2nd, 3rd and 4th floors (P2, B2, P3, B3, P4, B4), - auxiliary rooms of the supermarket (P-5, B-7, B-8). In addition, separate exhaust systems are provided for bathrooms, showers.

Project's Content

icon 1234.dwg

Additional information

Drawings content

icon 1234.dwg

1234.dwg
up Up