KRUN-10Kv (Section, geology profile, installation method, architectural view)
- Added: 22.02.2015
- Size: 2 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
KRUN-10Kv (Section, geology profile, installation method, architectural view. It was used as additional material for protection in the examination.
P.S. The cable exit from the ground must be shown before entering the PRUN, in a metal pipe.))))
P.S. The cable exit from the ground must be shown before entering the PRUN, in a metal pipe.))))
Project's Content
krun-10kv-na-opublikovanie.dxf
|
Similar materials
Free downloading for today
Update after: 10 hours 17 minutes