Job instruction for 6-10 kV support

  • Added: 30.08.2014
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Project content: - organization of production quality control; Job Instruction TK- II-1-10R loading and unloading of 6 (10) kV AR metal supports from bent profile; TK- II-2-10R Job Instruction for assembly of 6 (10) kV HF metal supports from bent profile at the station; Job Instruction TK- II-3-10R installation of 6 (10) kV AR metal supports from bent profile with development of pits by drilling and crane machine; Job Instruction TK-I-4-10 installation of uninsulated wires on 6 (10) kV VL metal supports from bent profile; Job Instruction TK-I-4I-10 installation of insulated wires on 6 (10) kV HF metal supports from bent profile