• RU
  • icon Waiting For Moderation: 0
Menu

Installation of ventilation systems with air disinfection in the branch of OGUZ Amur Regional PDD in Zeya

  • Added: 03.07.2014
  • Size: 503 KB
  • Downloads: 0
Find out how to download this material

Description

Course design-graphic part: plan of the first and second floors, axonometric diagram of the plenum and exhaust system, section on the building, plan and section of the ventilation chamber, equipment specification-explanatory note: determination of air exchange, calculation and selection of ventilation grilles, aerodynamic calculation of the plenum and exhaust system, calculation of local resistances, calculation and selection of air heaters, selection of ventilation equipment, acoustic calculation

Project's Content

icon
icon Вентиляция .dwg
icon Вентиляция.docx

Additional information

Contents

. Determination of air parameters

2. Determination of required air exchange

3. Calculation and selection of grids of supply and exhaust valve systems

4. Fundamental decisions on the organization of the air regime of premises

4.1. Plenum systems

4.2.Taking systems

4.2. Ventilation ducts and air ducts

5. Aerodynamic calculation of supply and exhaust systems

5.1. Aerodynamic calculation of plenum system P

5.2. Aerodynamic calculation of exhaust system B

6. Calculation and selection of air heaters for supply system P

7. Calculation and selection of ventilation equipment for plenum and exhaust chambers

7.1. Selection of fan-fan

7.2. Selection and calculation of the film

7.3. Air intake unit

7.4. Selection of louver latches-current

7.5. Selection of insulated valve-on

8. Design of plenum ventilation chamber with mechanical motive

9. Arrangement of plenum ventilation chamber equipment with mechanical

motive-em

10. Acoustic calculation of ventilation system

Conclusion

List of used literature

Fundamental decisions on the organization of the air regime of premises

4.1 Supply systems

The building is equipped with three systems of mechanical plenum ventilation :

• for rooms of the first and second floors;

• for assembly hall;

• for film projection.

The supply systems equipment is located in a separate room (ventilation chamber) located in the basement. The supply system includes: air intake shaft (one for 3 systems); cold receiving chamber (one for 3 systems); heaters, insulated valves and other ventilation equipment.

4.2 Exhaust system

The building is equipped with one mechanical and three natural exhaust systems. Separate mechanical systems are designed for rooms, sanitary units and storerooms of harvesting equipment of the first and second floors, assembly hall. For the pantry and meeting room - natural, for which the height of the ejection should be at least 1 m, from the roof elevation, since the design building has an attic floor.

4.3 Ventilation ducts and ducts

In the building, rectangular air ducts are designed for the gasket, since they are combined with the interior of the interior. In corridors, ducts are routed behind set ceilings. Air ducts are routed taking into account their smallest length.

Design of Mechanical Plenum Ventilation Chamber

The plenum chambers shall be located taking into account the intake of air from the non-contaminated areas, as well as at minimum cost. Height of rooms for ventilation equipment should be provided taking into account the operation of lifting machines in it, but not less than 2.2 m from the elevation of the clean floor to the bottom of the projecting floor structures. The width of the passage between the projecting parts of the equipment, as well as between the equipment and construction structures should be provided taking into account the repair and installation work, but not less than 0.7 m.

9. arrangement of plenum ventilation chamber equipment with mechanical motive

In the plenum ventilation chamber we install equipment for air treatment and its supply to the premises. The building is equipped with four plenum systems of mechanical ventilation, then we install 3 fans, 3 heaters, 3 filters in the ventilation chamber. We arrange a pre-chamber, the entrance to which is carried out through a sealed door. Use of soft inserts on fan suction and delivery pipes is required.

Drawings content

icon Вентиляция .dwg

Вентиляция .dwg

Free downloading for today

Update after: 17 hours 40 minutes
up Up