• RU
  • icon Waiting For Moderation: 21
Menu

Installation of one-story building. Exchange rate project on construction production technology.

  • Added: 07.10.2016
  • Size: 3 MB
  • Downloads: 2
Find out how to download this material

Description

Exchange rate project on construction production technology. Installation of one-story building. Made in the Archimandrite. In Russian. Crane movement diagram, column installation diagram, symbols, rigging devices, schedule, list of machines, permissible deviations, methodological instructions, labor protection, TEP

Project's Content

icon rgz--po-tsp.pln

Free downloading for today

Update after: 23 hours 2 minutes
up Up