Heating and ventilation of the building BMZ 1200 CHP.
- Added: 14.08.2014
- Size: 3 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The ventilation design of the BMZ-1200 building at the Northern CHPP-27 was developed on the basis of the Customer's task, architectural and construction assignment and in accordance with SNiP 2.
Project's Content
|
|
ТЭЦ-27_БМЗ 1200_Cad04.dwg
|
Additional information
Drawings content
ТЭЦ-27_БМЗ 1200_Cad04.dwg
Similar materials
- 18.09.2022
Free downloading for today
Update after: 23 hours 10 minutes
- 24.04.2014