Heat networks. Heat supply of the pool. CU
- Added: 14.08.2014
- Size: 1 MB
- Downloads: 2
Description
The source of heat supply of the basin is the existing PUZHKh boiler house with Nadenyaev hot water boilers.
Pool coolant - water with parameters of 95-70 ° С.
Project's Content
|
|
|
alldata.dwg
|
profil.dwg
|
readme.txt
|
|
Задание отделу АСО от сектора ТГС и В по дог.doc
|
план-сетей.dwg
|
Additional information
JI assignment from IR seeker and B department by 6249-0-TS1
Develop the construction part of the heating networks according to the attached drawings.
Pits with size of 0,50,50,5 shall be provided in places of installation of valves for water lowering.
Maintenance platforms shall be provided in places of installation of shutoff valves and valves for air exhaust.
Application:
Heat network plan with designation and numbering of fixed supports and sections - 1 sheet.
Longitudinal profiles of heat networks with pipe sections, nodes - 1 sheet.
Tables 1, 2, 3 - 1 sheet.
Table 1
alldata.dwg
profil.dwg
план-сетей.dwg
Similar materials
- 01.07.2014
- 24.01.2023
- 29.07.2014
- 09.07.2014