GSV boiler room with two boilers Pegasus F3 136
- Added: 09.08.2014
- Size: 172 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The boiler house gas supply project was carried out on the basis of the permit for the use of gas limits and in accordance with the requirements of SNiP 2.04.08-87 * "Gas Supply," PB 12-368-00 "Safety Rules for Gas Facilities."
Project's Content
|
Pegasus.dwg
|
Additional information
Drawings content
Pegasus.dwg
Similar materials
- 04.11.2022
- 09.07.2014
Free downloading for today
Update after: 16 hours 31 minutes