• RU
  • icon Waiting For Moderation: 0
Menu

Greenhouse - VK section

  • Added: 30.08.2014
  • Size: 2 MB
  • Downloads: 3
Find out how to download this material

Description

The project contains: - General data; System of internal drains K2. Plan for 0,000; System of internal drains K2. Diagram K2.Uzel 1. View 1. Section 1-1; Schematic diagram of rainwater tanks binding; Drip system. Plan for 0,000; Drip system. Diagram. Node 2. Valve assembly. Section 2-2; Evaporative cooling and humidification system. Plan for 0,000; Evaporative cooling and humidification system. Diagram. Nodes 3,4. Valve assembly; Production sewage system K3. Process drainage and recirculation system. Plan for 0,000; Production sewage system K3. Process drainage and recirculation system. CP diagram. Node 5. Drainage and recirculation diagram; Irrigation water supply and backup watering system. Plan for 0,000; Irrigation water supply and backup watering system. Diagram. Nodes 6.7; Water treatment. The plan on otm.0.000 in axes of A27-A40 and A-page. Schematic diagram; Cold water metering unit. Plan for 0,000 in axes A26-A32 and A-C. Section 3-3

Project's Content

icon
icon
icon В10.dwg
icon Водоподготовка.dwg
icon ДренажК3.dwg
icon К2.dwg
icon Обшие данные ВК.doc
icon СИО.dwg
icon СКП.dwg
icon СО(ВК).doc

Additional information

Drawings content

icon В10.dwg

В10.dwg

icon Водоподготовка.dwg

Водоподготовка.dwg

icon ДренажК3.dwg

ДренажК3.dwg

icon К2.dwg

К2.dwg

icon СИО.dwg

СИО.dwg

icon СКП.dwg

СКП.dwg
up Up