General plan GP-4, gas turbine engine, GTU and recovery boiler (Viktor)
- Added: 17.12.2014
- Size: 596 KB
- Downloads: 9
Description
Gas turbine engine.
Production building. (GTU and recovery boiler).
Project's Content
|
|
|
|
|
|
|
|
- AutoCAD or DWG TrueView
Additional information
5 пр.корпус.dwg
1 ГП.dwg
2 турбина.dwg
Similar materials
- 24.01.2023
- 24.01.2023
- 27.04.2026