Modernization of a 2.4 GW NPP start-up and backup boiler plant using flue gas heat recovery technologies
Description
8 drawings: 1 - General plan of the facility, 2 - boiler room plan, 3 - boiler room thermal diagram, assembly drawing of the Danstoker TDS-40 boiler, 5 - condensing heat exchanger, 6 - power supply diagram, 7 - automation diagram, 8 - technical and economic indicators
Project's Content
|
|
The material is a file that can be opened in program:
- AutoCAD or DWG TrueView
Similar materials
- 24.01.2023
Free downloading for today
Update after: 16 hours 51 minutes