• RU
  • icon Waiting For Moderation: 0
Menu

Modernization of a 2.4 GW NPP start-up and backup boiler plant using flue gas heat recovery technologies

Description

8 drawings: 1 - General plan of the facility, 2 - boiler room plan, 3 - boiler room thermal diagram, assembly drawing of the Danstoker TDS-40 boiler, 5 - condensing heat exchanger, 6 - power supply diagram, 7 - automation diagram, 8 - technical and economic indicators

Project's Content

icon Чертежи. Готовое казейка.dwg
The material is a file that can be opened in program:
  • AutoCAD or DWG TrueView
up Up