Gas supply to a private house in Nizhny Novogorod
- Added: 09.08.2014
- Size: 742 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
1. Project Executed but based on specification No. 4-0191 D dated 04.05.2012. JSC Nizhny Novgorod Oblgaz branch No. 4. 2. Working drawings are developed In accordance with the current norms, rules and standards, as well as industrial safety requirements In the field of protection of the population and territories from emergency situations, sanitary and epidemiological well-being of the population, environmental protection, environmental safety, fire safety, pipe protection In construction.
Project's Content
|
Королёв С.Ю. Молчаново Клепиковская д 13.cdw
|
Additional information
Drawings content
Королёв С.Ю. Молчаново Клепиковская д 13.cdw
Similar materials
Free downloading for today
Update after: 14 hours 39 minutes