• RU
  • icon Waiting For Moderation: 0
Menu

Gas supply to a private house in Nizhny Novogorod

  • Added: 09.08.2014
  • Size: 742 KB
  • Downloads: 0
Find out how to download this material

Description

1. Project Executed but based on specification No. 4-0191 D dated 04.05.2012. JSC Nizhny Novgorod Oblgaz branch No. 4. 2. Working drawings are developed In accordance with the current norms, rules and standards, as well as industrial safety requirements In the field of protection of the population and territories from emergency situations, sanitary and epidemiological well-being of the population, environmental protection, environmental safety, fire safety, pipe protection In construction.

Project's Content

icon
icon Королёв С.Ю. Молчаново Клепиковская д 13.cdw

Additional information

Drawings content

icon Королёв С.Ю. Молчаново Клепиковская д 13.cdw

Королёв С.Ю. Молчаново Клепиковская д 13.cdw
up Up