Four storey three-span industrial building
- Added: 04.03.2015
- Size: 2 MB
- Downloads: 0
Description
1. Construction site of Astrakhan
2. Column grid L1 x L2 6.3 * 6 m
3. Standard floor height H 4.2 m
4. Temporary floor load 5 kN/m2
5. Concrete class as per SNiP 2.03.01-84 * *
6. Class of the strained A800 fittings
7. Class of not strained A400 fittings
8. Conditional design soil resistance R0 0.22 MPa
9. Number of floors 4
Project's Content
|
жбк пз оля.docx
|
жбк оля.dwg
|
Additional information
1. Building Design Layout
The task of building structural diagram layout is as follows:
Selection of the direction of the main secondary floor beams when it is made in monolithic concrete.
Selects the direction of the precast crossbar, selects the type of slab panel, and selects the shape of the crossbar section.
Defines the minimum thickness of the exterior structural walls and the layout of the building cross-section.
Subdivision of the building into temperature blocks.
Provision of spatial rigidity of the building.
1.5 Subdivision of the building into temperature blocks
In order to reduce the forces from temperature change and shrinkage, buildings are divided along the length into separate parts (blocks) by temperature shrinkage sutures. The distance between the seams is set either by calculation or by the designer's directory. The maximum distance between temperature seams in the walls of heated buildings at outdoor temperature up to 30 0C is 60 m for clay bricks, and 40 m for silicate brick masonry.
1.6 Providing spatial rigidity of the building
The spatial rigidity of the building with an incomplete frame is provided by frames, disks of inter-floor floors, brick walls, which are vertical connected diaphragms. Special links are not required in this case.
Monolithic Floor Design
When designing a monolithic slab, the design is calculated for slabs and secondary beams. The calculation of the main beams is similar to the calculation of the prefabricated continuous girder and according to this, the calculation is not carried out in accordance with the task and the agreement.