Fire tank 80 m3
- Added: 24.04.2014
- Size: 445 KB
- Downloads: 1
Description
1. The fire tank is made of polypropylene from OOO NPO Orthech-Housing and Communal Services.
2. Installation of the tank is performed after insulation of the external surfaces of the tank.
3. Masonry from concrete blocks should be carried out on 20 mm thick M100 cement-sand mortar with careful filling of vertical joints with M100 cement-sand mortar. Local seals shall be made of concrete. B15.
4. All structures in contact with soil should be painted with hot bitumen in 2 times using cold bitumen primer. When performing works, follow the requirements of SNiP 3.04.01-87 "Insulation and adhesive coatings."
5. The base of the tank is a sandy bed. 600 mm.
6. Backfilling is performed by soft non-swelling and non-aggressive soil with layer-by-layer compaction up to Kcom = 0.92.
7. No additional loads other than the own weight of the ground shall be permitted above the underground tank.
8. Work shall be carried out according to the "Work Execution Project," which shall reflect the requirements of the SNiP chapters, the instructions of this project, as well as safety measures.
Composition:
General data, Layout of 80 m ³ tank in the ground, Layout of concrete blocks 1 row, Layout of concrete blocks 1 row