• RU
  • icon Waiting For Moderation: 12
Menu

Exchange rate heating project of a 3-storey building

  • Added: 27.04.2015
  • Size: 97 KB
  • Downloads: 0
Find out how to download this material

Description

No drawings, just a note.
Heating and ventilation systems are being designed in a three-story residential building. Construction is underway in the city of Arkhangelsk. The building is brick, with a floor height of 3 meters. The heating system centralized with a temperature of heat carrier of 150-70 wasps. Entry into the building is through the basement, basement height 2 meters

Project's Content

icon
icon Пояснит.записка.doc
up Up