Development of three variants of the road bridge
- Added: 06.02.2024
- Size: 9 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
In the course project, three variants of the road bridge structure were developed with the following initial data: bridge opening - 142 m, roadway clearance G-8 + 20.75, navigable clearance - 80 * 14.5 (the rest of the data are in the PZ). The volumes and costs of each of the options have been calculated. General views and cross-sections for each variant are drawn (sheet 1). For the 18 m long superstructure, calculations were made for endurance, strength, crack resistance, etc., and the details of the structure of the main elements were drawn. (sheet 2)
The graphic and textual part of the project is carried out in accordance with the requirements of the ESKD and SPDS standards.
Project's Content
Мосты.Профиль 12 вариант.dwg
|
Пояснительная записка.docx
|
Similar materials
- 25.10.2022
Free downloading for today
Update after: 22 hours 46 minutes