• RU
  • icon Waiting For Moderation: 0
Menu

Development of planned tasks for a railway marshalling yard

  • Added: 21.09.2024
  • Size: 713 KB
  • Downloads: 0
Find out how to download this material

Description

Introduction                                                                                                           

1 Technical and economic characteristics of the station8

2 Technical plan (determination of volume and quality                      

indicators of the station's performance)

3 Plan for labor and wages                                                               

4 Calculation of operating costs and production costs

Station                                                                                                           

5 Development of organizational and technical measures for 

increase in the efficiency of work, calculation of their effectiveness                 

Conclusion                                                                                                 

References                                                            

Project's Content

icon Пояснительная записка.docx
icon Графическая часть.cdw

Free downloading for today

Update after: 5 hours 12 minutes
up Up