• RU
  • icon Waiting For Moderation: 0
Menu

Development of planned tasks for a railway marshalling yard

  • Added: 21.09.2024
  • Size: 713 KB
  • Downloads: 0
Find out how to download this material

Description

Introduction                                                                                                           

1 Technical and economic characteristics of the station8

2 Technical plan (determination of volume and quality                      

indicators of the station's performance)

3 Plan for labor and wages                                                               

4 Calculation of operating costs and production costs

Station                                                                                                           

5 Development of organizational and technical measures for 

increase in the efficiency of work, calculation of their effectiveness                 

Conclusion                                                                                                 

References                                                            

Project's Content

icon Пояснительная записка.docx
icon Графическая часть.cdw
up Up