Design of the construction of a yard around the trunk. Scheduling the construction of a yard near the trunk

  • Added: 17.12.2023
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

St. Petersburg Mining University
Department of Construction of Mining Enterprises and Underground Structures
Computational and graphical assignment for the discipline "Design of construction of mining enterprises and underground structures"
On the topic: Design of the construction of a near-trunk yard. Scheduling the construction of a yard near the trunk
St. Petersburg 2023

Source data:
Strength of host rocks, MPa 60
Rock Hardness Coefficient 6
Average speed of mine workings, m3/month 400
Shaft hoisting capacity, m3/month 2800
Rock loosening coefficient 2
Introduction:
The near-trunk yard is one of the most responsible, complex and expensive complexes of the mine. Near-shaft yards of mines and mines are a complex of workings and chambers that connect mine shafts with all other workings and ensure the functioning and life of underground mining. As a rule, the service life of the near-shaft yard is calculated for the entire life of the mine, so the layout of the workings, the choice of the type of support, technological and transport interchanges are very important, and the duration of the construction of the mining enterprise as a whole depends on the choice of methods and methods for carrying out the near-shaft yard.
Content:
INTRODUCTION 3
INPUT 4
1. DESIGN OF THE YARD AROUND THE TRUNK 5
2. SCHEDULING THE CONSTRUCTION SCHEDULE OF THE YARD AROUND THE TRUNK 9
FINDING 10
REFERENCES 11

Project's Content

icon Zapiska_OD_Stepanov_V_D.docx
icon RGZ_okolostvolny_dvor_chertyozh.dwg
icon Zapiska_OD_Stepanov_V_D.pdf
icon RGZ_okolostvolny_dvor_raschyoty.xlsx
icon Chertezh_A1.pdf

Free downloading for today

Update after: 4 hours 32 minutes
up Up