Degree project 9-storey residential building. PGS

  • Added: 11.06.2014
  • Size: 2 MB
  • Downloads: 3
Find out how to download this material

Description

The diploma project "9-storey residential building" includes an explanatory note consisting of calculations, tables, diagrams, drawings. and 15 drawings:
1. Gen. plan
2. Design Option Feasibility Study
3. Facade 1-21
4. Facade 22-37
5. Standard floor plan in axes 1-21
6. Standard floor plan in axes 1-21
7. Typical floor plan in axes 22-37
8. Section 1-1, Elevation Slice
9. Facade P-A
10. Frames. rebar grids C1, C2, specification
11. Pedestal Plan, Foundation Section Diagram
12. Foundation sections
13. Pit Plan, Work Flow Chart
14. Layout of floor slabs. slinging of floor slab
15. Stroygenplan

Project's Content

icon
icon
icon
icon
icon
icon 01.DB
icon 0IP-0.DB
icon 0IP#0.DB
icon 0var-m.DB
icon 0var-s.DB
icon 11.DB
icon 1IP-0.DB
icon 1IP#0.DB
icon 1var-m.DB
icon 1var-s.DB
icon 21.DB
icon 2IP-0.DB
icon 2IP#0.DB
icon 2var-m.DB
icon 2var-s.DB
icon D1.DB
icon DIP-0.DB
icon DIP#0.DB
icon Dvar-m.DB
icon Dvar-s.DB
icon Dvar-m-res.doc
icon Dvar-m-лок.doc
icon Dvar-m-ЛРВ.doc
icon Dvar-m.doc
icon Dvar-s-res.doc
icon Dvar-s-ЛОК.doc
icon Dvar-s-ЛРВ.doc
icon Dvar-s.doc
icon оба.doc
icon укруп.doc
icon d1.ini
icon dip-0.ini
icon dip#0.ini
icon dvar-m.ini
icon dvar-s.ini
icon 01.PX
icon 0IP-0.PX
icon 0IP#0.PX
icon 0var-m.PX
icon 0var-s.PX
icon 11.PX
icon 1IP-0.PX
icon 1IP#0.PX
icon 1var-m.PX
icon 1var-s.PX
icon D1.PX
icon DIP-0.PX
icon DIP#0.PX
icon Dvar-m.PX
icon Dvar-s.PX
icon DIP-0.TXT
icon DIP#0.TXT
icon Dvar-m.WBD
icon Dvar-s.WBD
icon Dvar-m.WRI
icon Dvar-s.WRI
icon 01.X02
icon 0IP-0.X02
icon 0IP#0.X02
icon 0var-m.X02
icon 0var-s.X02
icon DIP-0.xls
icon DIP#0.xls
icon 01.Y02
icon 0IP-0.Y02
icon 0IP#0.Y02
icon 0var-m.Y02
icon 0var-s.Y02
icon 6=итого.doc
icon 6=осп-3.doc
icon 6=осп-кон-10.doc
icon 6=осп-табсет-7.doc
icon 6=эос-1.doc
icon DIP-0[14].doc
icon DIP-0лр.doc
icon DIP#0-0объ.doc
icon DIP#0[17].doc
icon DIP#0лр.doc
icon
icon 1=тэо-кон.doc
icon 1=тэо-лрв.doc
icon 1=тэо-м-1.doc
icon 1=тэо-нач.doc
icon 1=тэо-т11.doc
icon 1=тэо-т12.doc
icon
icon 2=арх-16.doc
icon teplo.dwg
icon teplo1.wmf
icon teplo2.wmf
icon teplo3.wmf
icon
icon 3=ркр-лкп-7.doc
icon 3=ркр-общ-2.doc
icon 3=ркр-пл-11.doc
icon 3=ркр-ф-10.doc
icon
icon 4=оиф-9.doc
icon 4=оиф-наука-2.doc
icon oif1.wmf
icon oif2.wmf
icon oif3.wmf
icon
icon 5=тсп-26.doc
icon 5=тсп-3кон.doc
icon tsp-ein2.wmf
icon tsp-ein3.wmf
icon tsp-zwei1.wmf
icon
icon 7=бжд-1.doc
icon 7=бжд-2-свет.doc
icon 7=бжд-22.doc
icon
icon Danilin.doc
icon Аннотация.doc
icon Введение.doc
icon ЛИТ-РА.doc
icon Содержание.doc
icon
icon Задание данилин.doc
icon Задание.doc
icon Образец данилин.doc
icon Образец.doc
icon
icon ш1-тэо.doc
icon ш2-аср.doc
icon ш3-ркр.doc
icon ш4-оиф.doc
icon ш5-тсп.doc
icon ш6-эос.doc
icon ш7-бжд.doc
icon
icon 01-genplan.dwg
icon 02-teo.dwg
icon 03-fasad[1].dwg
icon 04-fasad[2].dwg
icon 05-arxra[1].dwg
icon 05-magazin.dwg
icon 06-arxra[2].dwg
icon 07-fas+raz.dwg
icon 08-fasbok.dwg
icon 09-plita.dwg
icon 10-rostwerk.dwg
icon 11-fund.dwg
icon 12-tsp-ein.dwg
icon 13-tsp-zwei.dwg
icon 14-strgplan.dwg

Additional information

Contents

Contents

Introduction

Summary

1. Feasibility Study for Design Option Selection

1.1 General provisions

1.2 Calculation of estimated cost of construction and installation works

1.3 Calculation of capital investments for the purchase of construction equipment

1.4 Characteristics of the main design solutions

2. Architectural and construction section

2.1 General part

2.2 General characteristics of the building

2.3 Space planning solutions

2.3.1 Foundations

2.3.2 Exterior walls

2.3.3 Exterior Finishes

2.3.4. Partitions

2.3.5 Floors and coverings

2.3.6 Interior Finishes

2.3.7 Floors

2.3.8 Windows and doors

2.3.9 Kitchens

2.3.10 Bathrooms and sanitary units

2.3.11 Stairwell

2.3.12 Elevators

2.3.13 Heating

2.3.14 Water supply

2.3.15 Sewerage

2.3.16 Power supply

2.3.17 Garbage duct

2.4 Technical and economic indicators

2.5 Climatic characteristics of Orel

2.6 Heat Engineering Calculation

2.6.1 General provisions

2.6.2 Outer Wall Calculation

2.6.3 Calculation of thickness of attic insulation

2.6.4 Determination of heat absorption index of floor surface

2.7 Development Master Plan Decision

3. Design Section

3.1 Calculation of reinforced concrete strip pedestals of pile foundations

3.1.1 Calculation of reinforced concrete strip pedestals of pile foundations for external walls

3.1.2 Calculation of transverse rods

3.1.3 Calculation for push-through

3.2.1 Calculation of reinforced concrete strip pedestals of pile foundations for internal walls

3.2.2 Calculation of transverse rods

3.2.3 Calculation for push-through

3.3.1 Calculation of precast reinforced concrete march

3.3.2 Determination of loads and forces

3.3.3 Preliminary assignment of dimensions of the cross section of the march

3.3.4 Calculation of inclined section for transverse force

3.4.1. Calculation of reinforced concrete slab

3.4.2. Define Loads

3.4.3 Calculation of the plate shelf

3.4.4 Calculation of frontal edge

3.4.5 Calculation of inclined cross section of frontal rib for transverse force

3.5 Calculation of multi-stop slab

3.5.1 Calculation by limit states of the first group

3.5.2 Calculation of multi-stop plate by limit states of the second group

3.5.3 Pre-stress loss of valves

3.5.4 Calculation by crack formation,

normal to longitudinal axis

3.5.5 Calculation of plate deflection

4. Foundations and foundations

4.1 General provisions

4.2 Engineering and geological conditions of the construction site

4.3 Measures to reduce deformations due to frost straining forces

4.4 Measures for the period of operation of buildings and structures for soil protection based on excess water saturation

4.5 Technical Instructions for Construction of Pile Foundations

4.6 The solution and geo-ecological approach to the problem of the adjacent foundations are applied

5. Construction production technology

5.1 General provisions

5.2 Earthworks

5.3 Piling Procedure

5.4 Technology of erection of cast-in-situ reinforced concrete pile

5.5 Safety precautions during works

5.6 Reinforcement of cast-in-situ reinforced concrete pile

5.7 Concreting

5.8 Concrete mix supply and distribution equipment

5.9 Laying of concrete mixture

5.10 Quality control and acceptance of works

5.11 Compaction of concrete mixture

5.12 Features of concrete works at negative temperatures

5.13 Installation of wall foundation blocks

5.14 Layered masonry

5.15 Floor slabs

5.16 Installation works

5.17 Stone works

5.18 Roof

5.19 Requirements for roofing

5.20 Insulation Layer Requirements

5.21 Operational quality control of construction works

5.22 Determination of crane parameters

6. Economy and organization of construction

6.1 Determination of estimated construction cost

6.2 Determination of estimated cost in local and object estimates

7. Occupational and environmental protection

7.1 Analysis of hazardous and harmful factors

7.2 Safety features during construction

7.3 Occupational safety of excavator drivers

7.3.1 Safety requirements before starting operation

7.3.2 Safety requirements during operation

7.3.3 Safety requirements in emergency situations

7.3.4 Safety requirements upon completion of operation

7.4 Occupational safety of masons

7.4.1 Safety requirements before starting operation

7.4.2 Safety requirements during operation

7.4.3 Safety requirements in emergency situations

7.4.4 Safety requirements upon completion of operation

7.5 Ensuring fire safety

7.6 Environmental protection measures

7.7. Lighting Calculation

7.7.1. Temporary lighting

7.7.2 Calculation of searchlight of the construction site

7.7.3 Calculation of searchlight of construction area by method of light flux

7.7.4 Calculation of site searchlight by specific power method

Summary

The diploma project on the topic: "The project of a residential 9-storey building at different levels in Orel" is presented in the form of a graphic part and an explanatory note. The graphic part consists of 14 sheets, including: feasibility study, master plan, facades, standard floor plans, section, fragments of the 1st floor plan, pile plan, foundation sections, work flow diagrams, construction plan.

The calculation and explanatory note reflects issues on architecture, structures, foundations and foundations, technology of construction production, economics and organization of construction, as well as issues of labor and environmental protection.

Introduction

The housing problem was and remains one of the most important problems for the Russian Federation and the Oryol region in particular. The only correct way to overcome the real problem is the intensive construction of multi-storey residential buildings .

Construction, being a material-intensive, labour-intensive, capital-intensive, energy-intensive and knowledge-intensive production, contains a solution to many local and global problems, from social to environmental.

Construction organizations have an urgent need for large volumes of construction and installation work involving free labor resources, especially from among unemployed citizens.

In connection with the aggravated environmental problems, it is extremely important to use the natural conditions of the construction site as rationally as possible.

A diploma project on the topic: "The project of a residential 9-storey building at different levels in Orel" reveals the possibilities of designing buildings that are most rationally inscribed in natural conditions .

Geoecological construction proposes and justifies the incorporation of building foundations into the natural geological environment, without disturbing the general ecosystem and thereby aims to preserve natural landscapes and differs from the traditional incorporation of engineering structural systems into the geomorphological environment of the construction site. This predetermines the mass transfer system of the erected structure to the geoecological environment.

In addition, this favors and ensures the geoecological protection of the base and contributes to the rational development of underground space.

The problems raised in this diploma project were covered by the author in scientific papers in 1999 and 2000 .

Drawings content

icon teplo.dwg

teplo.dwg

icon 01-genplan.dwg

01-genplan.dwg

icon 02-teo.dwg

02-teo.dwg

icon 03-fasad[1].dwg

03-fasad[1].dwg

icon 04-fasad[2].dwg

04-fasad[2].dwg

icon 05-arxra[1].dwg

05-arxra[1].dwg

icon 05-magazin.dwg

05-magazin.dwg

icon 06-arxra[2].dwg

06-arxra[2].dwg

icon 07-fas+raz.dwg

07-fas+raz.dwg

icon 08-fasbok.dwg

08-fasbok.dwg

icon 09-plita.dwg

09-plita.dwg

icon 10-rostwerk.dwg

10-rostwerk.dwg

icon 11-fund.dwg

11-fund.dwg

icon 12-tsp-ein.dwg

12-tsp-ein.dwg

icon 13-tsp-zwei.dwg

13-tsp-zwei.dwg

icon 14-strgplan.dwg

14-strgplan.dwg

Free downloading for today

Update after: 13 hours 49 minutes
up Up