• RU
  • icon Waiting For Moderation: 1
Menu

Construction of the Polotsk hydroelectric power station - Activities on the reservoir bed

Description

Construction of the Polotsk hydroelectric station on the Zapadnaya Dvina River of the Vitebsk Region. Activities on the reservoir box. Stage 16.8.1 Polotsk district. Arrangement of structures for water discharge from the roadway of bridges. Structure No. 4, 41. Structure - Drainage trays of LV1, LV2, LV3, LV4; Diagram of designed measures. Working drawing

Project's Content

icon
icon 533e7ef96e7e0-__________.dwg
The material is an archive with files that can be opened in programs:
  • AutoCAD or DWG TrueView

Additional information

Drawings content

icon 533e7ef96e7e0-__________.dwg

533e7ef96e7e0-__________.dwg
up Up