Description

Cold water supply

   Cold water supply  is accepted -  hospy.

The number of  inputs is three.  

Installation of  MTK meters 0314515 18M001 (20 mm) is provided  apartment by apartment.

To ensure the required pressures, the project provides for a pumping station,

located in the  technical underground.

The installation includes:

- Pumps "Pedrollo" three-phase  capacity

1,2-6m3/h h-39-15m N-0.75kW suction height up to 7m

2CP25/130N 2pcs  (1 working,1 standby):

Pipelines at the inlet,  strapping of the pumping station are made of polypropylene pipes Ø110-25 mm   Main pipelines, risers  and  connections  to  sanitary  appliances  are  made of polypropylene pipes Ø63x5,8 mm-Ø20x1,9 mm  TEBO.  

The main networks of  cold water supply laid in the technical underground are thermally insulated (insulation thickness b = 40 mm).

Pipelines are laid openly  - under the ceiling of the technical underground; hidden - in mines  and in strabs.

Project's Content

icon 7-ми этажный дом-ВК.dwg
up Up