Cold water supply
Cold water supply is accepted - hospy.
The number of inputs is three.
Installation of MTK meters 0314515 18M001 (20 mm) is provided apartment by apartment.
To ensure the required pressures, the project provides for a pumping station,
located in the technical underground.
The installation includes:
- Pumps "Pedrollo" three-phase capacity
1,2-6m3/h h-39-15m N-0.75kW suction height up to 7m
2CP25/130N 2pcs (1 working,1 standby):
Pipelines at the inlet, strapping of the pumping station are made of polypropylene pipes Ø110-25 mm Main pipelines, risers and connections to sanitary appliances are made of polypropylene pipes Ø63x5,8 mm-Ø20x1,9 mm TEBO.
The main networks of cold water supply laid in the technical underground are thermally insulated (insulation thickness b = 40 mm).
Pipelines are laid openly - under the ceiling of the technical underground; hidden - in mines and in strabs.