Compressor shop of the main gas pipeline
- Added: 24.02.2023
- Size: 45 MB
- Downloads: 0
Description
The foundations, the planning and lifting position of the pile after clogging, reinforcing grillages, installation of formwork, manufacture of piles, the device of the heat-insulating screen for RM, coating waterproofing of the FM1 foundation.
Installation of the capacity of the underground drainage
Installation executive schemes
Installation diagram of the head
Installation schemes of embedded products, metal payments
Master mounting schemes; The device of the thermal insulation screen; RM1 grillage formwork device; Device of coating insulation of grillages RM1; Reinforcement of grillages RM1, and the position of embedded products, etc.
Circuits of electrical heater of pipelines BC, Ba, K, DM, B2, K3, G2, and tanks
Scheme of a gas engine compressor
The location of the grillages and foundations of the binding of GPa
Nodes schemes
Specification of metal rolling
Project's Content
|
10121314 Лист 81.dwg
|
130-131-132-133.dwg
|
130-монтаж ёмкости.dwg
|
мачты.dwg
|
рм1.dwg
|
0038.001.008.Р68.0004.173.9008.1041.101-ОЭ_л.4_(Схемы).dwg
|
Монтажные схемы (оголовки 124абв).dwg
|
ФУНДАМЕНТЫ-ЗГТВКИ_1.dwg
|
0038.001.008.Р68.0004.173.9008.1041.101-ТХГП_л.4.dwg
|
0038.001.008.Р68.0004.173.9008.1041.101-ОЭ_л.2_(План).dwg
|
0038.001.008.Р68.0004.173.9008.1041.101-ОФ.dwg
|
Similar materials
- 30.10.2024
- 09.08.2014
- 29.07.2014
- 09.08.2014