• RU
  • icon Waiting For Moderation: 30
Menu

Compressor shop of the main gas pipeline

  • Added: 24.02.2023
  • Size: 45 MB
  • Downloads: 0
Find out how to download this material

Description

The foundations, the planning and lifting position of the pile after clogging, reinforcing grillages, installation of formwork, manufacture of piles, the device of the heat-insulating screen for RM, coating waterproofing of the FM1 foundation.

 

Installation of the capacity of the underground drainage

 

Installation executive schemes

 

Installation diagram of the head

 

Installation schemes of embedded products, metal payments

 

Master mounting schemes; The device of the thermal insulation screen; RM1 grillage formwork device; Device of coating insulation of grillages RM1; Reinforcement of grillages RM1, and the position of embedded products, etc.

 

Circuits of electrical heater of pipelines BC, Ba, K, DM, B2, K3, G2, and tanks

 

Scheme of a gas engine compressor

 

The location of the grillages and foundations of the binding of GPa

 

Nodes schemes

 

Specification of metal rolling

Project's Content

icon
icon 10121314 Лист 81.dwg
icon 130-131-132-133.dwg
icon 130-монтаж ёмкости.dwg
icon мачты.dwg
icon рм1.dwg
icon 0038.001.008.Р68.0004.173.9008.1041.101-ОЭ_л.4_(Схемы).dwg
icon Монтажные схемы (оголовки 124абв).dwg
icon ФУНДАМЕНТЫ-ЗГТВКИ_1.dwg
icon 0038.001.008.Р68.0004.173.9008.1041.101-ТХГП_л.4.dwg
icon 0038.001.008.Р68.0004.173.9008.1041.101-ОЭ_л.2_(План).dwg
icon 0038.001.008.Р68.0004.173.9008.1041.101-ОФ.dwg
up Up