• RU
  • icon Waiting For Moderation: 0
Menu

Autonomous systems of private housing

  • Added: 01.07.2014
  • Size: 2 MB
  • Downloads: 0
Find out how to download this material

Description

The project contains the following calculations for the heating system - - calculations for the ventilation system - - calculations for hot water - - calculations for the selection of equipment for the boiler house - - specification for the considered systems - - drawings of plans with application of the corresponding system -acconometry to the boiler house system - diagram

Project's Content

icon
icon гвс хв аксонометрия.dwg
icon проект.doc
icon Лист Microsoft Office Excel.xlsx
icon схема.dwg
icon спецификация.dwg
icon отопление аксонометрия.dwg
icon первый этаж.dwg
icon цокольный этаж.dwg
icon второй этажк.dwg
icon вент аксонометрия.dwg

Additional information

Contents

Introduction

1. Design parameters of external and internal air

2. Heat Engineering Calculation of Enclosing Structures

3. Calculation of heat losses

4. Heating system

4.1. Hydraulic calculation of heating system

4.2. Heating Fixtures Calculation

4.3. Calculation of warm floors

5. Ventilation

5.1. Air exchange of rooms

5.2. Aerodynamic calculation

6. Hot water supply

6.1. Hydraulic calculation of hot water supply system

7. Gas supply

8. Boiler room equipment selection

9. Application

Introduction

This project was developed in accordance with the requirements of SNiP23022003 "Thermal protection of buildings," SNiP230199 "Construction climatology," SNiP2.04.0591 * "Heating, ventilation and air conditioning."

In the course project, autonomous systems of a single-apartment residential building and an individual boiler room are being developed .

The following issues are addressed in the work:

1. heating - structural development of the heating system; calculation of heat losses of rooms; hydraulic calculation of pipelines; calculation of heating devices.

2. ventilation - design development of ventilation system; aerodynamic calculation of the system and selection of necessary equipment.

3. hot water supply - structural development of hot water supply system; hydraulic calculation of the system.

4. selection and binding of boiler room equipment.

1. design parameters of external and internal air

Outdoor air parameters of Ryazan according to Table 1 [2] are as follows:

cold period of the year

parameters B:

air temperature of the coldest five-day week, wasps,

security of 0.92 text = 27 ° С;

duration, day, period with average daily allowance

air temperature z = 208 days;

average air temperature, OS, tht = 3.5 wasps.

Design temperatures of internal air tint are accepted according to [4]. For the cold period of the year:

the angular living room - 22 wasps;

the living room - 20 wasps;

kitchen - 20 wasps;

San. knot - 24 wasps;

the hall - 18 wasps;

wardrobe - 18 wasps;

storerooms - 16 wasps;

hoz. rooms - 16 wasps;

the boiler house - 16 wasps;

vent. the camera - 16 wasps;

garage - 5 wasps.

Drawings content

icon первый этаж.dwg

первый этаж.dwg

icon второй этажк.dwg

второй этажк.dwg

Free downloading for today

Update after: 8 hours 8 minutes
up Up