• RU
  • icon Waiting For Moderation: 0
Menu

Automation of the hot water boiler house

  • Added: 28.09.2014
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Reconstruction of the isolated room No. 1 on the street. Pervomaiskaya, 159 in Pinsk for the soft furniture factory of Pinskdrev Holding Campaign CJSC with the construction of a boiler house on wood waste
Working Design - 14 Drawings and Bill of Materials

Project's Content

icon pinsk-2004-atm.dwg

Additional information

Drawings content

icon pinsk-2004-atm.dwg

pinsk-2004-atm.dwg
up Up