Automation of the hot water boiler house
Description
Reconstruction of the isolated room No. 1 on the street. Pervomaiskaya, 159 in Pinsk for the soft furniture factory of Pinskdrev Holding Campaign CJSC with the construction of a boiler house on wood waste
Working Design - 14 Drawings and Bill of Materials
Working Design - 14 Drawings and Bill of Materials
Project's Content
|
|
The material is a file that can be opened in program:
- AutoCAD or DWG TrueView
Additional information
Drawings content
pinsk-2004-atm.dwg
Similar materials
- 14.08.2014
Free downloading for today
Update after: 13 hours 22 minutes