Automation of the hot water boiler house
- Added: 28.09.2014
- Size: 1 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Reconstruction of the isolated room No. 1 on the street. Pervomaiskaya, 159 in Pinsk for the soft furniture factory of Pinskdrev Holding Campaign CJSC with the construction of a boiler house on wood waste
Working Design - 14 Drawings and Bill of Materials
Working Design - 14 Drawings and Bill of Materials
Project's Content
pinsk-2004-atm.dwg
|
Additional information
Drawings content
pinsk-2004-atm.dwg
Similar materials
- 14.08.2014
Free downloading for today
Update after: 17 hours 4 minutes