Automation of basement ventilation during reconstruction.
- Added: 14.08.2014
- Size: 723 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The section provides for automation of operation of exhaust systems B9 and B1 and inflow P5 for overpressure of the lock tambour in case of fire and control of smoke removal valves in case of fire.
Project's Content
|
|
МолСлад-АОВ1(изм).dwg
|
Additional information
Drawings content
МолСлад-АОВ1(изм).dwg
Similar materials
- 01.07.2014
- 03.07.2014
Free downloading for today
Update after: 8 hours 42 minutes