• RU
  • icon Waiting For Moderation: 3
Menu

2-storey administrative building

  • Added: 24.03.2012
  • Size: 3 MB
  • Downloads: 3
Find out how to download this material

Description

Thesis project. There are all necessary drawings, accompanying documents and calculations.

Project's Content

icon
icon
icon СГП.dwg
icon календарный план.dwg
icon Технология.dwg
icon Фундаменты л.7.dwg
icon Конструкции л.6.dwg
icon Архитектура л.2-5.dwg
icon Сравнение.dwg
icon Список литературы..DOC
icon
icon сравнение вариантов.doc
icon Сметная часть.doc
icon
icon Пояснилка Архитектура.DOC
icon
icon кладка.DOC
icon Пояснилка Конструкции.DOC
icon
icon Расчет свайного фундамента. Новокрещенова.doc
icon
icon Калькуляция.xls
icon Технология.rtf
icon
icon объемы.xls
icon Таблица 1.doc
icon Таблица 6.doc
icon Календарный план испр 13.06..xls
icon Поясн 13.06 испр.rtf
icon
icon
icon stylesheet.css
icon tabstrip.htm
icon sheet001.htm
icon sheet002.htm
icon filelist.xml
icon Студ объектная.xls
icon Студ Сводная.xls
icon Записка.doc
icon Студент.xls
icon
icon БезЖД мой.doc
icon
icon озеленение.doc
icon введение.DOC
icon оглавление.doc
icon Реферат.doc
icon
icon GOST 2.303-68.lin
icon McsHatchBG.pat
icon McsHatchBH.pat
icon CS_Gost2304.shp
icon CS_Gost2304.shx
icon GOST 2.303-68.shx
icon SPDS.shx
icon CSSTD.ttf
icon GOST2304A.ttf

Additional information

Contents

Introduction

1 Variant Design

1.1 Description of options

1.2 Key Figures for Choice of Options

1.3 Heat engineering calculation of compared versions of wall enclosures

1.4 Determination of scope of works, consumption of main construction materials, installation capacity and cost of structures

1.5 Estimates

1.6 Calculation of economic efficiency

2 Architectural and structural part

2.1 Initial data

2.2 Master Plan. Improvement

2.3 Architectural and construction solutions

2.3.1 Space planning solutions

2.3.2 Structural solutions

2.3.3 Antiseismic measures

2.3.4 Fire fighting measures

2.3.5 Interior Finishes

2.3.6 External finishing

2.4 Engineering Equipment

2.4.1 Water supply and drainage

2.4.2 Sewerage

2.4.3 Heat supply

2.4.4 Power supply

2.4.5 Automation

2.4.6 Telephony, Radio, Television

2.4.7 Fire alarm

2.5 Heat engineering calculation of enclosing structures

2.5.1 Calculation of wall fence

2.5.2 Calculation of attic floor

3 Design and structural part

3.1 Calculation of wooden rafter system

3.1.1 Determination of loads on the rafter system structure

3.1.1.1 Geometric diagram of rafter system

p

3.1.1.2 Constant load

3.1.1.3 Snow load

3.1.1.4 Wind load

3.1.2 Determination of calculated forces

3.1.3 Check of sections of rafters system elements for strength and stability

3.1.3.1 Bracing calculation

3.1.3.2 Calculation of racks

3.1.3.3 Rafter calculation

3.1.4 Conclusions

3.2 Calculation of the structural wall stone wall

3.2.1 Initial data

3.2.2 Determination of seismic forces acting on the building

3.2.2.1 Basic provisions

3.2.2.2 Determination of initial data for calculation

3.2.2.3 Calculation results

3.2.3 Collecting loads on the window

3.2.4 Determination of design forces and characteristics

3.2.5 Checking the bearing capacity of the window

3.2.6 Calculation of lateral reinforcement of masonry

3.3 Calculation of pedestal

3.3.1 Initial data for calculation

3.3.2 Calculation of pile cap by strength of inclined sections

3.3.3 Buckle calculation for bending

3.3.4 Calculation of strength by inclined sections

3.4 Determination of the optimum value of prestress of valves

3.4.1 Subject of study

3.4.2 Setting of the task

3.4.3 Initial data

3.4.4 Variable change

3.4.5 Study results

3.5 Calculation of reinforced concrete flight of stairs

3.5.1 Initial data

3.5.2 Determination of the load on the march

3.5.3 Calculation of the normal section march

p

4 Foundations and foundations

4.1 Engineering and geological conditions of the construction site

4.1.1 Calculated values of physical properties of soil

4.1.2 Conclusions and recommendations

4.2 Calculation of pile foundation

4.2.1 General data

4.2.2 Determination of load capacity of driven hanging pile

4.2.3 Determination of design pile load and number of piles

4.2.4 Selection of hammer for pile diving and determination of design failure

4.3 Protection of piles against corrosion

5 Process Part

5.1 Scope of application

5.2 Calculation of Scope of Work

5.3 Construction Process Organization and Technology

5.3.1 Construction of wooden rafter roof

5.3.2 Metal Sheet Coating Arrangement

5.4 Logistical resources

5.5 Standard set for works execution

5.6 Calculation of labor costs and wages

5.7 Quality control of works

5.8 Safety precautions during works performance

5.9 Technical and economic indicators

6 Organizational part

6.1 Site Work Schedule

6.1.1 Drawing up the BOQ

6.1.2 Need for mechanisms

6.1.3 Work Schedule

6.1.4 Calculation of standard construction duration

6.2 Design of construction plot plan of the facility

6.2.1 Calculation of material stocks and storage areas

6.2.2 Calculation of temporary buildings and structures for construction maintenance

6.2.3 Calculation of temporary water supply

6.2.4 Calculation of temporary power supply

7 Economic part

7.1 Explanatory Note

p

7.2 Consolidated cost estimate for construction

7.3 Object estimate for the construction of the administrative building

7.4 Local resource estimate for civil works

8 Safety of life

8.1 CIW Safety

8.1.1 Safety Philosophy

8.1.2 TB for transport works

8.1.3 Safety requirements for storage of materials and structures

8.1.4 Earthworks

8.1.5 TB during concrete works

8.1.6 TB during installation works

8.1.7 TB during roofing operations

8.1.8 TB during finishing and glass works

8.1.9 TB during floor arrangement

8.1.10 TB during insulation works

8.2 Fire safety measures

8.2.1 General part

8.2.2 Classification of rooms and buildings according to the degree of explosion-fire hazard

8.2.3 Fire Safety Instructions

8.3 Nature and Environmental Protection

8.3.1 Assessment of violation of territory

8.3.2 Environmental monitoring

8.3.3 Main environmental measures at the construction site

9 Research and development

9.1 Introduction

9.2 Creating green spaces

9.2.1 Preparation of territories

9.2.2 Vegetation soils and soil preparation

9.2.3 Preparation of seats

9.2.4 Lawn Arrangement

9.2.5 Arrangement of flower beds

9.2.6 Road-path network arrangement

9.3 Conclusion

List of literature

Introduction

In general, landscaping means a complex of landscape work on the formation of the topography of the site, the construction of a lawn, the planting of plants (flowers, shrubs, trees and lians) and the creation of decorative compositions (alpine slides, rocars, hedges, reservoirs, etc.). This includes organizational work, the delivery of necessary materials and directly work on the site .

Work on landscaping of the sites is carried out according to the relevant projects (sketches or dendroplan). The design provides an opportunity not only to visualize the results of the upcoming work, but also to plan the work in such a way as to avoid unnecessary actions and, accordingly, unreasonable monetary overpayments in the process of work.

Landscaping of the site is more competent to start when the construction work and the main landscaping work are fully completed. That is, by the time the landscaping work begins, drainage should be carried out on the site, lighting cable and irrigation hoses should be laid, and all paving, recreation areas, etc. should also be done.

The sequence of landscaping work is not always the same and depends both on the types of upcoming work and on the situation on the site itself. Below is the most rational sequence of work on landscaping the site, to which everyone has the right to make their own situational adjustments .

1. Plot layout with existing soil, setting the required terrain and slopes for surface water runoff.

2. Filling with butter and/or sand in order to create a drainage layer for the lawn and small landings .

3. Filling with fertile soil, lawn level removal, ramming and soil layout.

4. Planting plants, creating flower beds and other decorative compositions.

5. Finishing layout, lawn sowing, supervision and care of the works.

Preparation of territories

All work on new construction, reconstruction and overhaul related to excavations can be carried out only after obtaining permission from the Association of Administrative and Technical Inspections of the city government.

Work on the preparation of the territory should begin with the clearance of buildings, stumps, remnants of building materials, garbage, etc., marking of collection sites, landfilling and removal of plant soil, as well as plant transplantation sites that will be used for landscaping of the territory. Filling of recesses and pits formed during disassembly of underground structures, walls and foundations shall be performed with sandy and loamy soils. In order to avoid subsidence of soils, filling with organic debris or waste of any chemical production is not allowed. Fine organic debris (sawdust, chips, leaves) can be mixed with bulk soil.

When organizing the construction site, measures should be taken to save and minimize damage to all plants noted in the project as preserved: fencing, partial cutting of low and wide crowns, protective binding of trunks, binding of the crown of shrubs.

If there is good grass on the territory, cut the dernin, store and take measures to preserve it (watering, attraction) for subsequent use in the construction of the lawn.

If it is necessary to increase the level of soil coating for the preservation of existing trees, a dry well and drainage system should be arranged around the trunk; when lowering the level for plant preservation, you should arrange a system of terraces and retaining walls or fill a layer of earth with a tree that protects the roots from damage (with a small difference in heights), without filling the root neck of the tree ..

When filling or cutting soil in areas of preserved green spaces, the size of holes and cups for trees must be at least 0.5 of the crown diameter and not more than 30 cm in height from the existing ground surface near the tree trunk .

Clearance of the territory from dryness and trees of a dysfunctional condition can be carried out with cutting of trees on the spot and subsequent removal of trunks or with cutting of fallen trees on the side. Removal of stumps should be carried out by roosters or a puncture mill.

Trees and shrubs suitable for transplantation should be dug up in accordance with the rules and used when landscaping this or other objects.

The vertical layout of the territory, the laying of underground communications, the construction of roads, driveways and sidewalks should be completed before the start of landings.

Conclusion

Landscaped areas are an integral part of any city. Along with architecture, landscaping objects participate in the formation of the city's appearance, have sanitary, recreational, landscape-architectural, cultural and scientific significance.

However, increased gas content, dust content and smoke content of air, features of temperature and water conditions of air and soil, adverse chemical and physical and mechanical properties of the soil, the presence of stone, concrete and metal surfaces, asphalt pavement of streets and squares, the presence of underground communications and structures in the zone of the root system, additional illumination of plants at night, an intensive regime of use of urban plantations by the population determine the specificity of the ecological environment of the city and its sharp difference from the natural situation in which biological and ecological features of plants were formed .

At present, an acute problem is the creation of a legislative and regulatory and technical framework that coordinates the useful effectiveness of green spaces with the social and economic interests of the legal owners of landscaped territories and administrative bodies of the city, as well as ensuring a systematic organization of labor and the appropriate quality of work and the state of green spaces.

Drawings content

icon СГП.dwg

СГП.dwg

icon календарный план.dwg

календарный план.dwg

icon Технология.dwg

Технология.dwg

icon Фундаменты л.7.dwg

Фундаменты л.7.dwg

icon Конструкции л.6.dwg

Конструкции л.6.dwg

icon Архитектура л.2-5.dwg

Архитектура л.2-5.dwg

icon Сравнение.dwg

Сравнение.dwg
up Up