10kV CSR Cell Installation Project for Auto Center

- Added: 28.03.2014
- Size: 634 KB
- Downloads: 1
Description
Power supply to the car maintenance technical center. Working project. Composition - General data on working drawings, Building 1A, page 2. RU 10kV. One-line schematic diagram, Building 1A, page 2. Placement of electrical equipment. Fragment of the plan at el. 0.000, Outdoor networks. Plot Plan, IP-10/1000-3150-30 pass-through insulator.
Project's Content
![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() |
Additional information
КСО_генплан.dwg

КСО_Заказная.dwg

КСО_общие данные.dwg

КСО_однолинейная схема.dwg

КСО_опросный лист.dwg

КСО_план.dwg

КСО_Титульный лист.dwg

проходной.dwg

Similar materials
- 22.08.2014
- 23.08.2014
- 04.11.2022