• RU
  • icon Waiting For Moderation: 4
Menu

Wooden glued three-ball frame - DBE, drawings

  • Added: 29.07.2014
  • Size: 1 MB
  • Downloads: 2
Find out how to download this material

Description

Course project-Food warehouse in the city of Minusinsk. The wooden frame is a three-ball frame of rectilinear elements. enclosing structures - panels with asbestos cement skins. Span 18m, building length - 66m, frame spacing - 6m, height to rafter structure bottom - 4.8m. Calculations are made on the basis of design variant

Project's Content

icon
icon Деревянная клеедосчатая трехшарнирная рама.dwg
icon Деревянная клеедосчатая трехшарнирная рама(записка).docx

Additional information

Option 1

The load-bearing structures of the coating are three-ball-and-pinned frames made of rectilinear elements with the connection of the crossbar and the post at the toothed joint, hingedly pinched in the foundation. Flat frames are installed with pitch of 6 meters.

Enclosing structures of walls and coverings are adopted in the form of insulated panels with asbestos cement skin. To transfer the load acting on the end of the building, fuselage posts are installed, which are pivotally connected at the top with a crossbar, and at the bottom with a foundation.

In order to ensure the stability of the building in the longitudinal direction, rigid connecting blocks are provided at the ends and in the middle of the building, with a pitch not exceeding 24 m in the light between them.

Intermediate flat structures are connected to connecting blocks by means of enclosing structures.

The link block in the building cover forms connections in the plane of the upper belts of the bearing structures of the cover, as well as vertical connections in the form of spacers.

Links in the plane of upper belts (rolling links) are designed to ensure the stability of compressed belts and to transfer and distribute loads from the end of the building to the coating.

To perceive horizontal loads acting on the building, and transfer them to the foundations in the plane of the walls, vertical connections between the frames are established. These connections are made in the form of crosses or straps and are installed at the locations of the connected coating blocks.

In the transverse direction, the rigidity of the building is ensured by pinching the posts into the foundations.

Option 2

The load-bearing structures of the coating are three-ball-shaped, gnoutic-glued frames hinged in the foundation. Flat frames are installed with pitch of 6 meters.

Enclosing structures of walls and coverings are adopted in the form of panels with asbestos cement skins. To transfer the load acting on the end of the building, fuselage posts are installed, which are pivotally connected at the top with the frame, and at the bottom with the foundation.

In order to ensure the stability of the building in the longitudinal direction, rigid connecting blocks are provided at the ends and in the middle of the building, with a pitch not exceeding 24 m in the light between them.

Intermediate flat structures are connected to connecting blocks by means of enclosing structures.

The link block in the building cover forms connections in the plane of the upper belts of the bearing structures of the cover, as well as vertical connections in the form of spacers.

Links in the plane of upper belts (rolling links) are designed to ensure the stability of compressed belts and to transfer and distribute loads from the end of the building to the coating.

To perceive horizontal loads acting on the building, and transfer them to the foundations in the plane of the walls, vertical connections between the frames are established. These connections are made in the form of crosses or straps and are installed at the locations of the connected coating blocks.

In the transverse direction, the rigidity of the building is ensured by pinching the posts into the foundations.

Drawings content

icon Деревянная клеедосчатая трехшарнирная рама.dwg

Деревянная клеедосчатая трехшарнирная рама.dwg

Free downloading for today

Update after: 10 hours 2 minutes
up Up