• RU
  • icon Waiting For Moderation: 0
Menu

Ventilation and conditioning of non-residential premises

  • Added: 14.08.2014
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Non-residential ventilation and air conditioning project in Moscow. Ventilation of rooms is designed with mechanical motive. The inflow is natural.

Project's Content

icon
icon
icon 700-12-13-ОВ.ПЗ_6.doc
icon 700-12-13-ОВ.С_6.doc
icon 700-12-13-ОВ_6.dwg

Additional information

Contents

CONTENTS

1 GENERAL DATA

1.1 INITIAL DATA

1.2 CLIMATOLOGICAL DATA

MAIN TECHNICAL SOLUTIONS

SAFETY AND PROMSANITARY

3.1 FIRE-FIGHTING MEASURES

3.2 PROMSANITARY

OPERATING INSTRUCTIONS

The technical solutions adopted in this section of the construction project comply with the requirements of environmental, sanitary, fire and other applicable norms and rules and ensure safe operation of the facility for life and health of people, subject to the measures provided by the project.

General Data

INPUT DATA

Detailed drawings are developed on the basis of the architectural and construction part of the project, design tasks in accordance with the current codes and regulations:

- SNiP 41012003 "Heating, ventilation and air conditioning";

- SP 118.13330.2012 "Public Buildings and Structures";

- SNiP 230199 * "Construction climatology";

- GOST 3049496 "Residential and public buildings. Indoor microclimate parameters ";

- SanPiN 2.4.1.304913 "Sanitary and epidemiological requirements for the structure, content and organization of the work regime of preschool educational organizations";

- MGSN 4.0705 "Preschool educational institutions."

CLIMATOLOGICAL DATA

Design parameters of outdoor air are accepted in accordance with

SNiP 230199 * "Construction climatology."

The parameters of internal air in the premises of the Department of Internal Affairs are adopted in accordance with SanPiN 2.4.1.304913 "Sanitary and epidemiological requirements for the structure, maintenance and organization of the operation regime of preschool educational organizations";

Main technical solutions for heating and ventilation systems

Ventilation of rooms is designed with mechanical motive. The inflow is natural.

In the warm period of the year, the internal air of the group, office and music hall is cooled with the help of the K1 channel air conditioner with the installation of the internal unit in the void with air intake from the corridor.

The B1 system is connected to the existing vent gate HSh1 with the installation of a channel fan in the buffer room. In the buffet room above the pli-ta, an exhaust wall umbrella is installed with a fat-collecting filter and connection to the fan B1.

Air cleanliness of the RD rooms is achieved by proper organization of their ventilation. Sanitary standards regulate the need for through and angular ventilation of premises, as well as the presence of windows and framugs for the inflow of outdoor air at a height of at least 2 m from the floor.

Ventilation through toilet rooms is not allowed.

In the presence of children, wide one-way aeration of all rooms in the warm season is allowed.

In the warm period of the year, the internal air of the group, office and music hall is cooled with the help of Dantex channel air conditioner.

Make sure that air ducts and equipment elevations are specified during installation.

Safety and industrial sanitation

3.1 FIRE-FIGHTING MEASURES

To ensure fire safety, the project provides for:

- fabrication of air ducts from non-combustible materials;

- grounding of ventilation system equipment and air ducts;

- air duct at the intersection of partitions and walls is laid in sleeves with sealing of clearances with non-combustible material.

Industrial hygiene

Construction, installation and commissioning works, equipment operation shall be carried out in accordance with the operating manual of the manufacturer of the mounted equipment

Operating Instructions

In order to ensure the operational reliability of ventilation systems during the entire period of their use for their purpose, buildings and structures should be operated within the limits of loads, microclimate parameters of the premises provided for in the design documentation.

During operation of the system, the current fire safety rules and standards must be complied with.

Faults detected during the operation of the systems, which can lead to explosions, fires, poisoning of people and other serious consequences, should be eliminated immediately after detection, the remaining faults - as planned.

Construction and installation works shall be performed by legal entities or individuals who have a permit (license) for the right to perform the above works.

Drawings content

icon 700-12-13-ОВ_6.dwg

700-12-13-ОВ_6.dwg

Free downloading for today

Update after: 17 hours 55 minutes
up Up