• RU
  • icon Waiting For Moderation: 23
Menu

Typical project 902-3-73.1.87 Septics and auxiliary structures with a capacity of 0.45 - 12.0 m3 per day

  • Added: 20.05.2015
  • Size: 660 KB
  • Downloads: 0
Find out how to download this material

Description

Typical project 902-3-73.1.87 Septics and auxiliary structures with a capacity of 0.45-12.0 m3 per day.

Composition:
  1. Album 1 Explanatory Note. Process part.
  2. Album 2 Building Part

Material: Reinforced concrete round rings

Format: djvu Archive composition:
  1. TP 902-3-73.1.87 album 1 Septica and auxiliary equipment. Explanatory note. Process part.djv
  2. TP 902-3-73.1.87 album 2 Septics and auxiliary equipment. Building part.djv

Project's Content

icon
icon ТП 902-3-73.1.87 альбом 1 Септики и вспомогательные соружения. Пояснительная записка. Технологическая часть.djv
icon ТП 902-3-73.1.87 альбом 2 Септики и вспомогательные соружения. Строительная часть.djv
up Up