• RU
  • icon Waiting For Moderation: 16
Menu

TTK Concreting of tape foundations with the help of a car concrete pump and transportation of concrete mixture with an auto concrete mixer - typical Job Instruction

  • Added: 24.04.2014
  • Size: 739 KB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 282.doc
up Up