TSU exchange rate - Calculation of boiler room thermal diagram
- Added: 03.12.2014
- Size: 382 KB
- Downloads: 1
Subscribe to receive an information about new materials:
Description
There are no drawings.
In this course work, we will consider the design of a production and heating boiler house with the installation of steam boilers of the DE grade. The steam generated by this boiler house will go to technological needs, as well as to the production of hot water for heating a residential area. Calculation of the heat scheme of the production boiler house is carried out for three modes: maximum winter, coldest month and summer. In this exchange rate design, the thermal scheme for the maximum winter period was calculated, for other modes the calculation is carried out in the same way .
In this course work, we will consider the design of a production and heating boiler house with the installation of steam boilers of the DE grade. The steam generated by this boiler house will go to technological needs, as well as to the production of hot water for heating a residential area. Calculation of the heat scheme of the production boiler house is carried out for three modes: maximum winter, coldest month and summer. In this exchange rate design, the thermal scheme for the maximum winter period was calculated, for other modes the calculation is carried out in the same way .
Project's Content
|
|
The material is a file that can be opened in program:
- Microsoft Word
Similar materials
- 23.08.2019
Free downloading for today
Update after: 13 hours 53 minutes