Third Ring Road, HDD Pipeline Installation
- Added: 13.02.2024
- Size: 4 MB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
TTK HDD Method
TTK is a device of a pit fur. way
TTK excavation device manual method
TTK Fixing the walls of the pit
Third Ring Road scheme of operation in the area of power transmission lines
TTK Installation of wells
Project's Content
ТТК .dwg
|
Similar materials
- 03.07.2014
Free downloading for today
Update after: 9 hours 36 minutes