Technological map for the construction of reinforced concrete structures of the first floor
- Added: 30.05.2023
- Size: 1 MB
- Downloads: 2
Find out how to download this material
Subscribe to receive an information about new materials:
Description
This technological map presents measures for the construction of reinforced concrete structures on the first floor of the restaurant building. Contains: formwork layout plan, symbols, tolerances and deviations, requirements for the quality of work, material and technical resources, slinging schemes, vibration scheme, technological schemes.
The explanatory note contains calculations for the selection of an assembly crane, the calculation of the amount of work, and the choice of the composition of the team.
Project's Content
ТК Монолитные работы.dwg
|
ТК Монолитные работы.docx
|
Similar materials
- 17.10.2022
- 07.09.2022
- 18.06.2023
- 20.08.2014
- 19.12.2023
- 22.10.2023
- 26.09.2022
Free downloading for today
Update after: 17 hours 3 minutes
- 21.04.2016