Technical re-equipment of the inter-farm gas pipeline and GRU.

  • Added: 09.08.2014
  • Size: 107 KB
  • Downloads: 0
Find out how to download this material

Description

The project provides for the technical re-equipment of the inter-farm gas pipeline and the GRU of the furnace compartment with its transfer to the external wall of the boiler room. Two files: 1.