• RU
  • icon Waiting For Moderation: 6
Menu

Technical re-equipment of the inter-farm gas pipeline and GRU.

  • Added: 09.08.2014
  • Size: 107 KB
  • Downloads: 0
Find out how to download this material

Description

The project provides for the technical re-equipment of the inter-farm gas pipeline and the GRU of the furnace compartment with its transfer to the external wall of the boiler room. Two files: 1.

Project's Content

icon
icon ГРУ л2-л6.cdw
icon ГСВ ОД л1.cdw

Additional information

Drawings content

icon ГРУ л2-л6.cdw

ГРУ л2-л6.cdw

icon ГСВ ОД л1.cdw

ГСВ ОД л1.cdw
up Up