Technical re-equipment of gas flow metering unit.
- Added: 11.08.2012
- Size: 537 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Technical re-equipment of gas flow metering unit. Replacement of BK G16 gas counter with SG-TK-D-25 system based on BK-G16 counter and TS-215 gas flow metering corrector. Installation of KTZ-50 thermal intake valve.
Project's Content
|
Котельная1.dwg
|
Additional information
Drawings content
Котельная1.dwg
Similar materials
Free downloading for today
Update after: 15 hours 28 minutes