Steps in the process of digging with the new blade design
- Added: 25.03.2024
- Size: 533 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
1 - transport position;
2- Start of the process of embedding into the array
(change of cutting angle to
maximum allowable values);
3 - penetration into the soil mass with
steady-state maximum
cutting angle;
4 - Cutting the ground with minimal
cutting angle and rear
Angle.
Project's Content
укфы.cdw
|
Similar materials
- 14.05.2017
- 24.04.2014
Free downloading for today
Update after: 13 hours 7 minutes