• RU
  • icon Waiting For Moderation: 22
Menu

Steps in the process of digging with the new blade design

  • Added: 25.03.2024
  • Size: 533 KB
  • Downloads: 0
Find out how to download this material

Description

1 - transport position;

2- Start of the process of embedding into the array  

   (change of cutting angle to  

   maximum allowable values);

3 - penetration into the soil mass with  

   steady-state maximum  

   cutting angle;

4 - Cutting the ground with minimal  

   cutting angle and rear  

   Angle.

 

Project's Content

icon укфы.cdw

Free downloading for today

Update after: 13 hours 7 minutes
up Up