• RU
  • icon Waiting For Moderation: 21
Menu

STEEL WORKING SITE OF INDUSTRIAL BUILDING

  • Added: 08.05.2017
  • Size: 1 MB
  • Downloads: 1
Find out how to download this material

Description

Drawing on Metal Structures for Course 3

Project's Content

icon
icon Металлы мои.docx
icon Мой ЧЕРТЕЖ МЕТАЛЛЫ 14 .cdw
icon Мой ЧЕРТЕЖ МЕТАЛЛЫ 15.cdw
icon Мой ЧЕРТЕЖ МЕТАЛЛЫ.cdw

Additional information

Contents

Introduction

1. Assignment for course work and initial data

2. Calculation of steel flooring and selection of pitch of secondary beams

3. Calculation of secondary beams

3.1.Determination of normative and linear design load

3.2.Assign and check sections

4. Calculation of the main beam

4.1.Determination of normative and linear design loads

4.2.Constructing and basic checks of main beam section

4.3.Locating stiffening ribs and checking the beam for local

stability

4.4. Calculation and design of the main beam support unit

5.Constructing and calculation of a continuous section

5.1.Section of column section

5.2.Verifying Local Stability

5.3.Base plate calculation

5.4.Define cross-arm height

5.5Compute column support rib

Literature

Introduction

In industrial buildings, the process often requires the installation of work sites raised above the floor or floor. These sites can contain workers, various materials, accessories, vehicles, etc.

The main element of the metal work platform is steel flooring, supported by a system of secondary beams. The latter rest on the main beams, which are installed on the system of metal columns. The platforms are equipped with stairs, railings, process openings. To make the structure stable, the columns are braced in longitudinal and transverse directions.

The task of designing the work site, as well as other structures and structures, is to satisfy the set technological requirements and operational reliability conditions with minimum metal consumption, minimum cost and labor intensity of manufacturing and installation of the structure.

In the designed work site, loads acting directly on the steel flooring are transferred to them on secondary beams. The latter transfer the load to the main beams, and they transfer it to the system of metal columns and their foundations.

Job for coursework and initial data

Build, calculate and design the structural elements of the work site, including the central compressed column, with the following input:

The layout and size of the site in the plan 3A × 3B; A = 10 m; V = 5 m;

Floor elevation 0.000 ;

The elevation of the top of the flooring is 6,000 m;

The building height of the slab is not limited;

Temporary standard evenly distributed load

30 kN/m2;

Structure material:

Flooring: steel of normal strength;

Secondary and auxiliary beams: steel of ordinary strength;

Main beams: steel of increased strength;

Columns: steel of normal strength;

Concrete of B15 class foundations;

Column section type: solid;

Weldment joint: welded;

The building is heated.

Drawings content

icon Мой ЧЕРТЕЖ МЕТАЛЛЫ 14 .cdw

Мой ЧЕРТЕЖ МЕТАЛЛЫ 14 .cdw

icon Мой ЧЕРТЕЖ МЕТАЛЛЫ 15.cdw

Мой ЧЕРТЕЖ МЕТАЛЛЫ 15.cdw

icon Мой ЧЕРТЕЖ МЕТАЛЛЫ.cdw

Мой ЧЕРТЕЖ МЕТАЛЛЫ.cdw

Free downloading for today

Update after: 17 hours 19 minutes
up Up