Sports complex with a hall 36 x 18 m
- Added: 03.07.2014
- Size: 602 KB
- Downloads: 7
Description
Project's Content
|
|
перспектива.jpg
|
пз спортзал.doc
|
спортзал.dwg
|
Additional information
Contents
1. Design Input
2. Project Content
3. Site Plot Plan
4. Volumetric planning solution
1. Space Explication
2. Technical and economic indicators
5. Architectural and artistic solution
1. - "Room Finish List"
2. - "Floor Explication"
6. Constructive solution
1. "Window, Door and Gate Specification"
2. "Item Specification"
7. Heat Engineering Calculation
7.1.Teplotechnical calculation of enclosing structure
8. List of used literature
2. Project content.
Construction is the main branch of the national economy. The intensification of all sectors of the economy, increasing production efficiency, accelerating scientific and technological progress, and solving pressing social problems of society are directly connected with construction. In our difficult economic times, we need to make the most reasonable use of construction machines and materials, improve construction, increase capital cost efficiency, and reduce construction time.
Task for coursework - Create an architectural and structural design of the building. The task consists of two parts: text and graphics. Specifies the building construction area, taking into account this, the thickness of the walls and insulation is selected. In this case construction area - II B
The project is developed in three stages: a) execution of a sketch-idea of the future project, b) development of a sketch project. c) finalization of drawings and preparation of explanatory note. Each stage of the project is approved by the teacher, in conclusion the project is protected.
4. Technical and economic indicators.
1) Working area 1108.0 m2
2) Usable area 1352.0 m2
3) Total area 11741.3 m2
4) Building area 1428.0 m2
5) Usable area per design indicator 2.2
6) Working area per calculated indicator 1.8
7) Working area per 1 m2 of usable area (K1) 0.82
8) Building volume 9034.0 m3
9) Construction volume per 1 m2 of usable area 6.7 m3
10) Construction volume per 1 m2 of working area 8.15 m3
11) Construction volume per operating indicator 14.5 m3
12) Expediency indicator
Working area/Total area = 0.1
13) Indicator of economical use of building volume in relation to working area
Construction Volume/Working Area = 8.15
14) Indicator of economical use of building volume in relation to total area
Construction volume/total area = 0.77