• RU
  • icon Waiting For Moderation: 37
Menu

Sports complex, EOM

  • Added: 03.07.2014
  • Size: 15 MB
  • Downloads: 0
Find out how to download this material

Description

Full electric project for the sports complex. It includes single-line diagrams, plans for outlet networks, lighting

Project's Content

icon
icon
icon plot.log
icon
icon plot.log
icon Генплан_STAS.tif
icon Лист 1.1.doc
icon Лист 1.2...1.7.doc
icon Лист 1.8..1.9.doc
icon Молниезащита (лист 33.1...33.2).bak
icon Молниезащита (лист 33.1...33.2).dwg
icon Петровский_uGP0003.tif
icon План наруж осв. (лист 34).dwg
icon Планы групповых сетей (лист 24...27).bak
icon Планы групповых сетей (лист 24...27).dwg
icon Планы групповых сетей (лист 24...27)_1.bak
icon Планы групповых сетей (лист 24...27)_1.dwg
icon Планы освещения (лист 16...19).bak
icon Планы освещения (лист 16...19).dwg
icon Планы распределительной сети (лист 28...31).bak
icon Планы распределительной сети (лист 28...31).dwg
icon Планы розеточной сети (лист 20...23).bak
icon Планы розеточной сети (лист 20...23).dwg
icon СПЕЦИФИКАЦИЯ556.xls
icon СУП (лист 32).dwg
icon Схемы щитов (лист 3...15).bak
icon Схемы щитов (лист 3...15).dwg
icon ТРН (лист 2.1...2.2).dwg
icon СЗ по Петровскому.bak
icon СЗ по Петровскому.dwg
icon СЗ по Петровскому_09.04.07.bak
icon СЗ по Петровскому_09.04.07.dwg

Additional information

Lightning protection system

According to the lightning protection device, the building of the multifunctional complex belongs to category III. As the interception rod the lightning protection grid from round steel d=8mm with a step of 10 m laid under a soft roof on a nonflammable basis is used, as well as the steel roof as a conductor cable is used fittings of columns of the building with a diameter not less than 8 mm. Reinforcement of building piles with area not less than 80 mm.sq is used as grounding conductor. The pitch of vertical current leads is 20 m, the pitch of horizontal current leads on the walls of the building is 20 m, which corresponds to the "Instruction on lightning protection of buildings, structures and industrial communications" No. SO15334.21.122-2003

Protective safety measures

The project provides for the following activities to ensure safety and health measures:

- protective grounding and grounding of electrical equipment;

- placement of electrical equipment in places convenient for maintenance;

- selection of reduced voltage for local portable lighting, at that, before lowering transformers, separation transformers are installed (PUE ch. 6.1.18);

- availability of a set of protective means ensuring safety against electric trams during operation of electrical installations.

The building uses the following protective electrical safety measures:

• use of a protective zero conductor in the group (plug) network;

• connection of luminaire housings to the protective zero conductor;

• grounding of electrical installations;

• potential equalization system

• connection of sockets via RCD (protective disconnection devices).

Organization of operation

Electrical installations shall be operated by trained electrical personnel.

Verification (primary, periodic, extraordinary) of personnel knowledge of rules, job descriptions and production instructions shall be carried out according to item 1.3.14. PTE EP of electrical stations and networks. The knowledge of each employee is checked individually. The results of the knowledge check are recorded in the log of the established form and signed by all members of the commission

The RP maintenance personnel shall have documentation on permissible operating modes under normal and emergency conditions.

Work in the existing electrical installations shall be performed according to the work permit, the form of which and instructions for its filling are given in Appendix No. 4 of the Labor Protection Rules (POT).

During works, organizational measures shall be performed, as per Chapter 2 of POS.

Technical measures to ensure safety of works (Chapter 3 of PET) shall be performed by performing works:

- protective disconnections;

- hanging of prohibition posters;

- check of no voltage;

-installation of grounding.

Fire safety measures

Electrical equipment of the building with regard to fire safety is designed in accordance with the current codes and regulations.

When a fire occurs in the building and the fire alarm is triggered, automatic shutdown of ventilation is provided. According to the automation project, block disconnection is performed (termination of power supply to the ventilation switchboard).

Drawings content

icon Молниезащита (лист 33.1...33.2).dwg

Молниезащита (лист 33.1...33.2).dwg

icon План наруж осв. (лист 34).dwg

План наруж осв. (лист 34).dwg

icon Планы групповых сетей (лист 24...27).dwg

Планы групповых сетей (лист 24...27).dwg

icon Планы групповых сетей (лист 24...27)_1.dwg

Планы групповых сетей (лист 24...27)_1.dwg

icon Планы освещения (лист 16...19).dwg

Планы освещения (лист 16...19).dwg

icon Планы распределительной сети (лист 28...31).dwg

Планы распределительной сети (лист 28...31).dwg

icon Планы розеточной сети (лист 20...23).dwg

icon СУП (лист 32).dwg

СУП (лист 32).dwg

icon Схемы щитов (лист 3...15).dwg

Схемы щитов (лист 3...15).dwg

icon ТРН (лист 2.1...2.2).dwg

ТРН (лист 2.1...2.2).dwg

Free downloading for today

Update after: 19 hours 38 minutes
up Up