Sport center
- Added: 31.01.2017
- Size: 942 KB
- Downloads: 1
Description
Sport center
Project's Content
|
|
3D - в дневное время.jpg
|
Объемно-планировочное и конструктивное решение.DOC
|
План 1-го этажа, план подвала.dwg
|
Разрез.dwg
|
Содержание.doc
|
Фасад.dwg
|
Additional information
Contents
Introduction
1 Architectural and construction part
1.1 Master Plan
1.2 Space Planning Solutions
1.3 Design Solutions
1.4 Heat Engineering Calculation
1.5 Calculation of steam permeability resistance
1.6 External and internal finishes
1.7 Engineering Equipment
2. Structural part
2.1 Choice of Floor Option
2.1.1 Load collection
2.2 Calculation of monolithic overlap
2.2.1 Calculation of multi-span slab of monolithic slab
2.2.2 Design data
2.2.3 Determination of forces in plates by method of limit equilibrium
2.3 Calculation of cast-in-situ floor beam
2.4 Foundation calculation
2.5 Calculation of cast-in-situ beam of foundation slab
2.6 Calculation of foundation for buttress
3. Process Part
3.1 General Instructions
3.2 Machines and mechanisms
3.2.1 Concrete pump, concrete ducts, and buckles
3.2.2 selection of installation crane for concrete works
3.2.3 compaction of concrete mixture
3.3 Concreting technology of the structure
3.3.1 Preparatory works
3.3.2 Process of erection of cast-in-situ reinforced concrete slab
3.3.3 Execution of technical documentation and acceptance of works
3.4 Concrete maintenance and quality control
3.4.1 Concrete care during hardening
3.4.2 Quality Control
3.4.3 Inspection of concrete quality
3.5 Occupational safety during concrete works
4. Organizational Part
4.1 General Instructions
4.2 Calculation of Scope of Work
4.3 Selection of methods of works execution
4.4 Determination of duration of works
4.5 Development of work schedule
4.6 Adjustment of the schedule
4.7 Development of construction master plan
4.7.1 Calculation and design of warehouses
4.7.2 Calculation of the need for sanitary and administrative premises
4.7.3 Calculation of Energy Demand
4.7.4 Calculation of Electricity Demand
4.8 Technical and economic indicators for SGP
4.9 Development of health and safety measures
5. Economic part
5.1 Estimated Construction Cost
5.2 Consolidated cost estimate for construction of business center
5.3 Object Estimate for Construction of Business Center
5.4 Local estimate
5.5 Calculation of economic effect due to reduction of invoices
costs of the construction organization
6. Safety of life
6.1 Occupational Safety
6.2 Safety in emergency situations
7. Environmental protection
7.1 Analysis of the state of the facility and planned activities
7.2 Protection of the air basin from pollution
7.3 Protection of water resources from depletion and pollution
7.4 Protection and management of land resources
7.5 Protection of plant and animal life
8. Research work
План 1-го этажа, план подвала.dwg
Разрез.dwg
Фасад.dwg
Similar materials
- 09.07.2014