• RU
  • icon Waiting For Moderation: 1
Menu

Single-line scheme of 110/10 kV branch substation

Description

Design of a 110/10 kV step-down step-down substation with a maximum load of 45 MW

Project's Content

icon Chertezhi.cdw
The material is a file that can be opened in program:
  • Kompas or KOMPAS-3D Viewer

Additional information

Drawings content

icon Chertezhi.cdw

Chertezhi.cdw
up Up