Sewage treatment facilities of the settlement
- Added: 28.02.2020
- Size: 2 MB
- Downloads: 4
Description
According to the task, the efficiency of the treatment plant is 9039.32 m ³/day. With maximum hourly flow rate qmax = 784.48 m3/h. Water disposal rate for the first area q1 = 195 l/day and the second area q2 = 250 l/day. Waste water consumption from the industrial enterprise is 4711.87 m3/day. The population is 17715 people. The reservoir belongs to category I. In this course design, it is necessary: to calculate and design sewage treatment facilities, determine the necessary degree of wastewater treatment, select the composition and type of treatment facilities, calculate the wastewater treatment plant, develop the general plan of the treatment plant, perform hydraulic calculation of communications and compile profiles on the movement of water and precipitation.
Project's Content
|
|
ПЗ.docx
|
Таблица 11 и 12.docx
|
ЧЕРТЕЖИ ГОТОВО.dwg
|
Additional information
Contents
Contents
Introduction
1. Determination of the required degree of wastewater treatment
1.1 Determination of pollution concentration in the city wastewater coming for treatment
1.2 Determination of equivalent number of inhabitants
1.3 Determination of river mixing ratio
1.4 Determination of the required degree of waste water treatment by suspended substances
1.5 Determination of required degree of purification by BSCP
1.6 Determination of required degree of waste water treatment by dissolved oxygen
1.7 Selection of cleaning method, treatment plant layout and types
constructions
2 Calculation of wastewater treatment facilities
2.1 Selection of receiving chamber
2.2 Calculation of grids
2.3 Calculation of sand heads
2.4 Calculation of sand silos
2.5 Selection of water measuring device
2.6 Calculation of primary sumps
2.7 Calculation of aerotank - displacer
2.8 Calculation of aeration system
2.9 Calculation of secondary settling tanks
2.10 Calculation of deep waste water treatment facilities
2.11 Calculation of water disinfection unit
2.12 Calculation of waste water discharge
3 Calculation of facilities for sediment treatment
3.1 Calculation of aerobic stabilizers
3.2 Calculation of sediment dewatering shop
3.3 Calculation of emergency sludge platforms
4 Hydraulic calculation of waste water and sediment flows
List of literature
Application
Similar materials
- 09.07.2014