Relocation of a 110 kV overhead line – moving two support structures out of the construction footprint
- Added: 16.10.2026
- Size: 1 MB
- Downloads: 0
Description
Relocation of the 110 kV overhead line outside the site boundaries – moving two support structures out of the construction footprint.
Project's Content
|
|
The material is a file that can be opened in program:
- AutoCAD or DWG TrueView
Additional information
Drawings content
НЭС110_Жибек жолы уч.35А_переустройство_12.06.2026.dwg
Similar materials
- 18.05.2023
Free downloading for today
Update after: 21 hours 51 minutes